Cosmari (MC)

Project Description:

Feasibility study for the project planning for two biogas plants for the utilization of FORSU and FOS (organic content of the non-separated waste collection) in the municipality of Tolentino (MC). The two plants will be integrated into the composting and municipal waste processes. The possible processing capacity is 50,000 tons FORSU and 10,000 tons FOS. The anaerobic digestion plant produces 30,000 tons of digestate, 20,000 tons of industrial water and 5,600 tons of biogas, which corresponds to an electricity production of 10,400 MWhel. Each of these individual systems is equipped with a CHP (combined heat and power) which works independently with a capacity 1,000 to 300 KWel.

Services Provided:

  • Pre-Feasibility study
  • Feasibility study
  • Preparation of the preliminary draft
  • Preparation of the final project
  • “Biomethane” feasibility study
  • Preparation of the tender

Mehr über diesen Leistungsbereich: